Challenge:
Provide gracious entry and gathering space to accommodate a large number of people, before and after functions. Provide adult education classrooms, multipurpose space to seat 800 for dinner. Accommodate handicapped accessibility for two separate multilevel church structures. All functions of the Church were to stay operational during construction.
Process:
This project was a design build
collaboration with the Nichols
Team.
Pictured: exterior photo of entry.
![]() |
|
©
2008 ArchitecturaPC, All Rights Reserved
For Technical Assistance with this web site please contact the webmaster.
Modified
|